> Go Paperless. Deliver on Time, on Budget <
One system. All project details. From planning to signoff.
> Why Paper-Based Work Packs Create Downstream Problems
Operators, contractors, and vendors are relying on outdated tools, paper-based documentation, and siloed reporting to do their jobs.
It can take up to 1–2 weeks for paper-based work packs to reach remote job sites. Shipping and closing out paper-based work packs can take 60–90 days, causing delays and interrupting sequential activities.
- Time and cost overruns from manual, paper-based work pack management
- Loss of information and lack of adequate records across project phases
- Compromised accountability and transparency between contractors, owners and stakeholders
- 7–14 day turnaround time for paper work packs to reach an offshore asset
- Inability to access real-time work pack information offsite — any inefficiency has downstream implications
- Inadequate constraint visibility: materials, permits and workforce readiness tracked in silos
> From Planning to Signoff
MODS Connect WorkPack replaces paper-based systems for more intelligent, transparent, and accountable project delivery through an accessible, easy to navigate cloud-based platform.
Delivering a real-time view of tasks from planning to signoff, MODS Connect WorkPack links all project information such as engineering, materials, inventory, fabrication, installation, industrial health and safety, scheduling, and estimated time for constraint-free project execution.
Digital work packs can be built with MODS Connect WorkPack whether or not data exists.

> No data? No problem with MODS Connect WorkPack
See how MODS Connect WorkPack works in environments with or without data — the perfect choice for brownfield and maintenance projects.
> Digital Work Packs Improve <
> Project completion dates & scheduled work timeframes
> Costs, budgets & additional funding requests
> Communication & connectivity across the organization
> Safe execution of work

> Supporting Advanced Work Packaging (AWP) implementation
Ensure your next project runs smoothly and efficiently with constraint visibility. This AWP checklist covers scope definition, digital readiness, constraint management, work package deployment and closeout — grounded in MODS software and services.
> Case Studies <
Petrofac — Brownfield UKCS Projects
MODS Connect was used to remove manual processes from their brownfield development projects. MODS Connect decreased administrative burdens to improve efficiency, reducing time and effort by 50%
Results:
- 50% time saved in providing clients with key project data
- Project transparency enabled informed decision making, anticipating and avoiding common pitfalls
- High volumes of diverse brownfield modifications delivered on time and within budget
JGC Group — EPC Projects Globally
MODS has enabled the paperless construction execution of around ten significant JGC projects.
Results:
- 70% reduction in time spent on piping inspection test packages
- 35% time saved due to a reduction in human error
- USD 3 million savings in labour costs on one oil refinery expansion project
- More streamlined communication with both internal and external partners
- Improved forecasting ability
MODS Connect, what people say:
"[With MODS Connect] we have standardized what 'good' looks like and we have the flexibility to meet client-specific requirements. We can record all information that goes into the system and measure and monitor data in a consistent manner so we can be very confident that what we report is accurate. Progress and photographs are at the click of a button."
UKCS brownfield projects
"The MODS system has been very well received by the construction team on site. We have noticed a substantial reduction in the administrative burden as well as significantly improved the flow of information between site supervision teams and management."